We performed the following works at the Toyo Tires production complex:
– Securing the construction camp and access roads
– Excavation of the humus layer on the building, parking lot and traffic areas
– Cement stabilization of the subsoil of the building and traffic areas
– Installation of stone aggregate
– Preparation and concreting of rigid pavement structures
– Installation of curbs and curbs
– Making a layer of asphalt BNS and AB
Period of execution of works: 2020. to 2022.