As part of the implementation of the new bus station construction project in Block 42, New Belgrade, Elita-Cop d.o.o. carried out works on the construction of foundation slab piles, as well as the construction of the reinforced concrete basement structure intended for the formation of the station platform.
Piles with diameters of Ø600 mm and Ø800 mm were executed using the CFA (Continuous Flight Auger) method, which was optimally adapted to the geotechnical conditions of the project site. This technology enables highly efficient execution through the use of modern equipment, increased productivity, low levels of vibration and noise, and minimal risk of borehole collapse.
The works included the following:
Project execution period: 2019–2020.